A Kassem, M, Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(09), 2767–93.

Adabre, M A and Chan, A P (2020) Towards a sustainability assessment model for affordable housing projects: the perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(09), 2523–51.

Ahmadu, H A, Ibrahim, A D, Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(09), 2199–219.

Akanmu, A, Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(09), 2577–90.

Almatroushi, H, Hariga, M, As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: an integrated approach. Engineering, Construction and Architectural Management, 27(09), 2135–61.

Amos, D, Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: a developing country perspective. Engineering, Construction and Architectural Management, 27(09), 2715–35.

Chiu, W Y B and Lai, J H (2020) Building information modelling for building services engineering: benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(09), 2221–52.

Edwards, D J, Rillie, I, Chileshe, N, Lai, J, Hosseini, M R and Thwala, W D (2020) A field survey of hand–arm vibration exposure in the UK utilities sector. Engineering, Construction and Architectural Management, 27(09), 2179–98.

Farajmandi, M, Ali, M, Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(09), 2615–41.

Hsu, P, Aurisicchio, M, Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(09), 2501–22.

Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(09), 2661–86.

Liu, H, Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction – method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(09), 2409–27.

Liu, J, Cui, Z, Feng, Y, Perera, S and Han, J (2020) Impact of culture differences on performance of international construction joint ventures: the moderating role of conflict management. Engineering, Construction and Architectural Management, 27(09), 2353–77.

  • Type: Journal Article
  • Keywords: Construction; Conflict management; Cultural differences; International joint venture; Project performance;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-02-2019-0111
  • Abstract:
    Cultural differences have been frequently cited as a major source of risks for international joint ventures (IJVs). Cultural differences may cause extensive conflicts in technology, norms and emotion among the international joint venture (IJV) partners. The purpose of this study is to explore the interactive effects of national culture differences (NCDs) and conflict management approaches on the performance of international construction joint ventures (ICJV).Design/methodology/approach Data were collected using a questionnaire survey method with 143 valid responses. Partial least squares structural equation modeling (PLS-SEM) was used to test the research hypotheses.Findings It was found that ICJV performance declined with a high degree of NCDs. The negative effect of NCDs on ICJV performance was mitigated by adopting the cooperative conflict management approach; while it was aggravated by adopting the competitive conflict management approach. The findings may provide an alternative way (i.e. adopting the cooperative conflict management approach rather than avoiding or competitive approaches) to address the cultural conflicts in the multicultural project management teams.Practical implications Firstly, as NCD negatively impacts performance of ICJVs, project managers should pay attention to cultural issues and learn how to manage them; Secondly, as cooperative and competitive conflict management approaches have different moderating effects on the relationship between NCD and ICJV performance, project managers must choose appropriate conflict management styles in multination teams. Thirdly, as the avoiding approach has no significant moderating effect on the negative relationship between NCD and ICJV performance, it is important for Chinese partners not to employ avoiding approach to deal with conflicts in ICJV.Originality/value This study uniquely adds to the literature on cultural issues in managing ICJVs by integrating the moderating effects of conflict management approaches. The interactive effects of conflict management approaches and national cultural differences on ICJV project performance may contribute to the theories regarding conflict management theory in the context of cross-cultural management.

Luo, L, Zhang, L and He, Q (2020) Linking project complexity to project success: a hybrid SEM–FCM method. Engineering, Construction and Architectural Management, 27(09), 2591–614.

Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: a qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(09), 2429–49.

Maqsoom, A, Hamad, M, Ashraf, H, Thaheem, M J and Umer, M (2020) Managerial control mechanisms and their influence on project performance: an investigation of the moderating role of complexity risk. Engineering, Construction and Architectural Management, 27(09), 2451–75.

Moon, S, Ham, N, Kim, S, Hou, L, Kim, J and Kim, J (2020) Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(09), 2271–86.

Nasirzadeh, F, Kabir, H D, Akbari, M, Khosravi, A, Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(09), 2335–51.

Sezegen, A and Edis, E (2020) Product innovation types: a discussion considering building facade products. Engineering, Construction and Architectural Management, 27(09), 2379–408.

Sinoh, S S, Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: a Malaysian case study. Engineering, Construction and Architectural Management, 27(09), 2737–65.

Tran, D H (2020) Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(09), 2287–313.

Tran, D Q, Harper, C M, Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(09), 2163–78.

Viswanathan, S K and Jha, K N (2020) Risk mitigation modelling of international construction projects executed by Indian firms: a structural equation modelling approach. Engineering, Construction and Architectural Management, 27(09), 2687–713.

Wang, P, Wu, P, Wang, X, Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(09), 2109–33.

Wu, J, Liu, H J, Sing, M C, Humphrey, R and Zhao, J (2020) Public–private partnerships: implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(09), 2253–69.

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(09), 2315–33.

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(09), 2553–76.

Zhang, H, Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(09), 2643–59.

Zhang, S B, Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(09), 2477–500.